Update of the hydrological–hydraulic studies and flood inundation maps for the Porce II and Porce III dams (Colombia) for EPM – 2023

Colombia
Client
Empresas Públicas Medellín (EPM)
Solution
Natural Hazards

The project consisted of updating the hydrology of the Porce II and Porce III dams in Colombia, including the effects of climate change, as well as developing a two-dimensional hydraulic model downstream of both dams and producing the flood inundation maps associated with the different calculation scenarios: dam breach, spillway operations and operational releases.


Based on the results obtained and their evaluation, a series of recommendations were also included throughout the documents to support decision-making regarding dam operation.